|
| PARTS FINISHING GROUP |
| 1. |
Hi-Tech
Coating - Warren, MI (586) 759-3559
Coats Applied: Chemlok adhesives for rubber to metal bonding, Teflon®, and Molydisulfides Protective
Zinc Rich and Anti-friction/Anti-noise.
Pre-Treatment - Zinc-Phosphate,
Manganese Phosphate
& Shot Blasting
Coating Process Methods - (3) Dip/Spin
lines, (1) Dip/Drain line, (3) Chain-on-Edge
lines and (2) Zinc-Phosphate
Coating lines. |
| |
|
| 2. |
Parts
Finishing Group - Chihuahua, Mexico (011)
52 614 488 1541
Coating Applied: Same as Hi-Tech (Warren, MI) See above
Pre-Treatment: Zinc
Phosphate, Manganese
Phosphate and Parts Washing
Coating Process Methods: (1) Dip/Spin
line, (2) Chain-on-Edge
lines and (1)Phosphate
coating line, (1) Paint stripping line
and (1) Shot Blast |
| |
|
| 3. |
PFG - Queretaro, Mexico (011)52 442 253 0126
Coating Applied: Same as Hi-Tech (Warren, MI) See above
Pre-Treatment: Zinc
Phosphate, Manganese
Phosphate and Parts Washing
Coating Process Methods: (1)
Dip/Spin line, (2) Chain-on-Edge
lines and (1) Phosphate
coating line, (1) Paint stripping line
and (1) Shot Blast |
| |
|
| 4. |
Parts Finishing Group
- Kendallville, Indiana (260) 599-0229
Coating Applied: Same as Hi-Tech Coatings (Warren, MI) See above.
Pre-Treatment: Zinc
Phosphate, Manganese
Phosphate and Parts Washing
Coating Process Methods: (1) Dip/Spin
line, (2) Two Chain-on-Edge
lines and (1) One
Phosphate Coating line, (1) One Paint
Stripping line and (1) Shot Blast |
| |
|
| 5. |
JML Painting
Warren, MI (586) 755-4053
Coatings Applied: Chemlok adhesives,
Teflon®, Epoxy, Zinc Rich, Iron
Phosphate.
Coating Process Methods: (1) HVLP Conveyorized
Spray lines, (2) Dip/Drain Lines, (1) Dip/Spin
line, (3) Hand Paint lines |
| |
|
| 6. |
Vassar Coatings
Vassar, MI (989) 823-1100
Coatings Applied: Enameling, Adhesives, Teflon®, Molydisulfides, Carc, Stearates
Coating Process Methods: (1) Combination
Conveyorized Washer, Iron
Phosphate, Chain-on-Edge Spray Coat/Ransburg
Disc, Oven and Chiller line. Also (1) Conveyorized
HVLP Spray Coat line and (1) Dip/Drain line. |
| |
|
| 7. |
Autophoretic
Division Chesterfield Township, Mi (586)/949-2735
Coatings Applied: 800 Series Autophoretic®, 900 Series Autophoretic®
Coating Process: Each conveyorized line has a pre-cleaning washing system. Parts are racked, washed, dipped, the coating chemically bonds and then cured in oven. |
| |
|
|
PARTS FINISHING GROUP DEBURRING AND WASHING PLANTS |
| 8. |
AUTOMATED
DEBURRING/A-1 PARTS WASHING, Warren, MI
(800) 234-5342
Process: Vibratory/Tumbling, Parts Washing and Chemical De-rusting
Process Lines: Conveyorized Parts Washing
line, (5) Tunnel Washers, (1) Auger Washer,
(12) Vibratory Deburring Units, (10) Tumblers
and (1) Ball Burnishing Unit. |
|
PARTS FINISHING GROUP SHOT PEENING/SHOT BLASTING PLANTS |
| 9. |
BELLEVUE
PROCESSING, Detroit, MI (313) 921-1931
Core Process: Shot Peening/Shot Blasting, Paint Stripping/Rust Removal
Process Lines: (8) Wheelabrators up
to 28 cu. ft., Air Actuated Shot Peening Equipment,
(3) Large Blast Rooms, Surface Preparation,
Rust Removal, Burn Off Furnaces, (3) Stage
Heated Chemical Stripping Lines, (3) Kolene®
Lines, Power Wash 3,000 PSI
|
| 10. |
Metal Prep Technology, 5650 W Jefferson, Detroit, MI 48209 (313) 843-2890
Process: Shotpeen/Shotblast, including spinner hanger blasting machines
|
|
PARTS FINISHING GROUP HONING, DRILLING, MACHINE & FABRICATING PLANT |
| 11. |
MICHIGAN
HONE & DRILL, Madison Heights, MI
(248) 616-9310
Production & Short Run - Honing
& Drilling: (30) Honing Machines &
(10) Deep Hole Drills, Bore Size Range, Hone
.06 to 14.00 I.D., Drilling .06 to 2.00 I.D.,
Length to 12 feet.
Machining: Prototype, Short Run, CNC, EDI, Grinding and Turning
Fabricating: Coating Racks and Fixtures
Saw Cutting: Tubing and Bar Stock Up to 25 ft. length |
|
|